PIEDMONT VALLEY ELEMENTARY ADDITION

The Piedmont Valley Elementary School (PVES) addition is a 12,600-square-foot expansion project completed for the Meade School District to accommodate the growing student population in Piedmont. This addition, part of the long-term partnership between Meade School District 46-1 and Architecture Incorporated, introduces eight new classrooms over two levels, providing modern learning environments and additional space for students and staff. The design includes indoor mechanical spaces for equipment longevity and ease of maintenance, and durable materials to withstand severe regional weather.

The project also addressed existing site drainage issues and expanded the septic system to handle the increased capacity and future needs. This comprehensive initiative not only meets immediate requirements but also positions the school for future growth, showcasing the successful collaboration between the school district and Architecture Incorporated. By incorporating modern design elements, durable materials, and addressing critical infrastructure needs, the project ensures a sustainable and conducive learning environment for years to come.

Size:

12,600 sq. ft. addition

Location:

Piedmont, South Dakota [View Map]

Completion Date:

2024

PV Elementary Addition_Right